Viindoo
Odoo Community
Viindoo Cloud
See what each production order consumed beyond its bill of materials
For manufacturers that produce from bills of materials
Material loss per production order, packing at the order, and Gantt planning for manufacturing.
Odoo 19.0 · Odoo Community · Viindoo Cloud · OPL-1
What changes for your team
Loss per order and per component
Today: over-consumption shows up later as a stock difference that nobody can trace to an order.
→ Each order records its standard quantity per component when it is confirmed. Once it is done, Loss Components Analysis compares standard and actual, by order, product, operation or date.
Finished goods packed at the order
Today: finished goods are received loose and packed in a separate step.
→ Put in Pack on the order splits the quantity produced into packages before it is stored, and the order lists its Packages.
Orders and work orders on a timeline
Today: planners read start and end dates from lists.
→ Manufacturing Orders and Work Orders open as a Gantt Chart; work orders are grouped by work center.
Ready on day one
Existing orders included
On installation, existing orders that have a bill of materials get their standard quantities from it as it stands then.
Gantt Chart in place
Manufacturing Orders and Work Orders offer the Gantt Chart view without any setup.
What the administrator turns on
Packages in the Inventory settings for packing; By-Products in the Manufacturing settings for by-product loss.
What is included
Loss analysis for components and by-products, packing at the order, and the Gantt Chart. The Manufacturing settings list the Viindoo manufacturing add-ons; one present on your server installs from its checkbox.
Optional extensions
The loss you planned for, next to the loss you got.
Manages the progress of manufacturing orders.
Manages subcontracting requests together with manufacturing and purchasing.
Before you decide
Does it change how production runs?
No. Orders are confirmed, produced and closed as in standard Manufacturing. One rule is added: the quantity produced cannot go below the quantity already packed.
What if the bill of materials changes after an order is confirmed?
The order keeps the standard recorded at confirmation. Backorders and split orders take the standard of the first order of their group.
What about a component added on the order by hand?
Added after confirmation, a component or by-product gets a standard of 0, so once the order is done the analysis lists its quantity as unplanned. The order's chatter logs an added component.
Who sees the analysis?
Manufacturing users read it; the system writes the lines and nobody edits them. Each user sees the orders of their own companies.
Does it need Accounting or a country setup?
No. It measures quantities, not values, and requires only Manufacturing and Web Gantt. It carries no country-specific content. Languages: English and Vietnamese.
Technical requirements
- Odoo version: 19.0
- Editions: Odoo Community, Viindoo Cloud
- Required modules: Manufacturing, Web Gantt
- License: OPL-1
- Languages: English, Vietnamese
This software and associated files (the "Software") may only be
used
(executed, modified, executed after modifications) if you have
purchased a
valid license from the authors, typically via Odoo Apps,
or if you
have
received a written agreement from the authors of the
Software (see the
COPYRIGHT file).
You may develop Odoo modules that use the Software as a library
(typically
by depending on it, importing it and using its
resources), but
without
copying any source code or material from the
Software. You may distribute
those modules under the license of your
choice, provided that this
license
is compatible with the terms of
the Odoo Proprietary License (For
example:
LGPL, MIT, or proprietary
licenses similar to this one).
It is forbidden to publish, distribute, sublicense, or sell
copies of the
Software or modified copies of the Software.
The above copyright notice and this permission notice must be
included in
all copies or substantial portions of the Software.
THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND,
EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF
MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE AND
NONINFRINGEMENT. IN NO EVENT
SHALL THE
AUTHORS OR COPYRIGHT HOLDERS
BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER
LIABILITY, WHETHER IN AN
ACTION OF CONTRACT, TORT OR OTHERWISE,
ARISING
FROM, OUT OF OR IN
CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER
DEALINGS IN THE
SOFTWARE.